Every project ends with a clear report: heatmaps, AP plans and recommendations written for both the engineers installing the network and the people paying for it.
Heatmaps
What each visualisation shows
Primary signal strengthThe strongest AP a device hears at every point, measured against the −65 dBm target.Signal-to-noise ratioSignal strength isn’t enough on its own. SNR shows whether devices can actually use it.Channel overlapHow many APs are heard per channel: enough for roaming, not so many that they interfere.AP placement & channel planInstaller-ready drawings with mounting positions, channels and power.BeforeSurvey of an existing network, showing exactly where it falls short.AfterThe redesigned network, validated on site against the same target.
The report
Inside a typical report
Executive summary. Pass/fail against requirements in plain English.
Requirements & design criteria. Coverage, capacity and the standard used.
Heatmaps per floor and band. Signal, SNR, overlap and data rate.
AP schedule. Model, location, mounting, channel and power.
Bill of materials for the chosen vendor.
Findings & recommendations, prioritised and costed where needed.
Ekahau project file on request, for your own engineers.